What does an ADU cost in Los Angeles?
Answer three questions and see the typical price range for your project right away. No email required, no games: just an honest starting point, based on what comparable projects in LA actually cost.
1. What do you want to build?
2. Size
400 sq ft
Smart size: under 500 sq ft your ADU is exempt from school district fees, and under 750 sq ft city impact fees do not apply either (California law).
3. Finish and options
Typical investment for this project in Los Angeles
$95,000 to $123,000
Based on typical garage conversion projects in LA. Your exact fixed proposal follows a free site visit, and that number is the one your contractor stands behind.
Get your exact fixed proposal, free
We check feasibility and match you with a vetted licensed contractor who turns this estimate into one fixed proposal. Free and no obligation.
What drives the cost of an ADU?
Two ADUs of the same size can differ a lot in price. The biggest factors: whether you convert an existing structure or build new, the state of your electrical panel and sewer line, how much plumbing the layout needs, and the finish level you choose. The kitchen and bathroom are the most expensive rooms in any ADU, which is why a second bathroom or a full kitchen moves the number more than extra floor area does.
That is also why Solid ADU works with one fixed proposal per project: we check feasibility first and match you with a vetted, CSLB-licensed contractor, so surprises surface before the contract, not after. Curious how the permit side works? Read our guide to LADBS permits and inspections.
Frequently asked questions about ADU costs
How accurate is this calculator?
The calculator shows the typical range that comparable projects land in across Los Angeles. It is deliberately a range: the exact number depends on your property, the condition of your garage or lot, and your material choices. After a free feasibility check we match you with a vetted licensed contractor, whose site visit turns the range into one fixed proposal. That is the number your contractor stands behind.
Why is a garage conversion usually the cheapest way to get an ADU?
The structure already exists: the foundation, walls and roof are there, and no new footprint is added. That saves on excavation, framing and often on planning requirements too. In California, converting a garage also does not require replacement parking, which keeps the scope tight.
What is included in these ranges?
Design, LADBS permits, construction, standard finishes and the trades you need to reach final inspection: electrical, plumbing and HVAC. Not included are things nobody can predict without seeing your property, such as major sewer upgrades, an electrical panel upgrade or heavy site work. Your contractor flags those during the free site visit before you commit to anything.
Does a bigger ADU always cost more per square foot?
Usually the opposite: the expensive parts of an ADU are the kitchen and bathroom, which every unit needs regardless of size. Extra bedroom or living space is comparatively cheap to add, so larger units often have a lower cost per square foot.
What is the 500 square foot rule for ADU fees?
Under California law, an ADU or JADU with less than 500 square feet of interior livable space is exempt from school district fees, which are otherwise charged per square foot. There is a second threshold at 750 square feet: below it, cities may not charge impact fees at all; at 750 and above, impact fees apply proportionally. That is why many Los Angeles ADUs are designed at 499 square feet. Our calculator flags both thresholds while you slide, and your contractor confirms the exact fees for your property in the proposal.
Can I finance an ADU in Los Angeles?
Many of our clients use a home equity line of credit, a cash-out refinance or a renovation loan. Rental income from the finished ADU often covers a large part of the monthly cost. We do not provide financing ourselves, but we are happy to talk you through what other homeowners in your situation typically do.
How long does the whole process take?
As a rule of thumb: plans and LADBS permits take a few months, and construction takes two to five months depending on the project type. A garage conversion is usually the fastest route because the structure already exists.